Completed in two phases, the new construction included a classroom building with clock tower, library with media center, cafeteria with a full service preparation kitchen to service several nearby schools, and separate administrative building. Notkin Hawaii Inc. provided mechanical engineering services including the schematic design, design development, construction documents, bidding/permit, and construction administration. |
Location Honolulu, Hawaii Year Completed 1995 Services Performed Schematic Design Design Development Construction Documents Bidding/Permit Construction Admin |